![]() ![]() This unit meets the requirements of the state and territory Work Health and Safety (WHS) Regulations, including licensing. This unit requires the operator to plan the work, carry out pre-operational safety checks, start the steam turbine, monitor steam turbine operation, and shut-down the steam turbine. uses attached condensers or a multi-staged heat exchange extraction process.is capable of a speed greater than 3600 rpm, or. ![]() ![]() This unit specifies the outcomes required to operate a steam turbine for licensing purposes, and covers the operation of any steam turbine (except a steam turbine that produces a power output of less than 500 kW) that:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |